India Issues Guidelines On 5G Trials Ahead Of Spectrum Auction

- Advertisement -
  • The DoT has fixed a uniform fee of Rs 5,000 for the 5G trial licence
  • The validity of the 5G trial licence will range between 3 month and 2 years, depending on the purpose of the trial 
  • Indian companies can also apply 5G trial licence for showing demonstration of the product

India’s Department of Telecommunications (DoT) has issued guidelines for 5G trials across all available spectrum bands indicating to allocate up to 400 MHz of radio waves for experiments, PTI reported.

The DoT has fixed a uniform fee of Rs 5,000 for the 5G trial licence. The validity of the 5G trial licence will range between 3 month and 2 years, depending on the purpose for which the trial is being conducted.

- Advertisement -

The guidelines issued on July 23 said typical values may be up to 100 MHz in 3.5 GHz band, 400 MHz in 26 GHz band and other potential millimetre bands.

India’s plan for 5G 
India’s telecom minister Ravi Shankar Prasad earlier indicated that the government has plans to conduct 5G spectrum auction for 5G services by the end of this year to enable the roll-out of commercial services using the technology in 2020.

Indian companies involved in research and development (R&D), manufacturing, telecom operators and academia for the purpose of R&D and experimentation can get 5G trial licence for a period of up to two years, renewable on case to case basis by WPC (wireless planning and coordination).

Indian companies can also apply 5G trial licence for showing demonstration of the product in the country, according to the guidelines. The guidelines bar companies from offering any commercial service using the 5G trial licence. However, the guideline did not indicate about a possible ban on telecom equipment makers such as Huawei or ZTE. 

The telecom department has set a deadline for itself to grant permits for the trails between 4 and 8 weeks. After the expiry of the deadline, the applicant will be required to send a notice for trial if the DoT has not given any response. If the applicant does not receive any reply within two weeks after giving the application, it will be deemed approval.

- Advertisement -

Most Popular Articles

LEAVE A REPLY

Please enter your comment!
Please enter your name here
Captcha verification failed!
CAPTCHA user score failed. Please contact us!

Exclusive

Low-Speed Scooters, E Rickshaws Major ‘Headache’ For EV Task Force?

0
Going ahead, the situation for low-speed electric two-wheeler and electric rickshaw retailers and makers looks a little cloudy. The bigger ones may want to join these segments...

Growth Opportunities Connected With The Growing Semicon EcoSystem In India

0
India must concentrate on electronics products and semiconductor components, as progress in one area reinforces the other. The country can unlock immense economic opportunities...

“Don’t Let Designations Become A Wild Goose Chase”

0
In his childhood, he possessed just one sweater, meant to last through many winters. He could not join IIT Roorkee because the cost of...

Buzz

Semiconductor Revolution: Cadence Empowers Bhutan’s VLSI Future!

0
Exclusive Partnership with Bhutan's Top College Signals a Game-Changer in Semiconductor Training. Cadence Design Systems has embarked on a transformative educational partnership with the College...

Saudi Arabia Targets Lithium For EV Goals

0
Saudi Arabia has begun investigating techniques to extract lithium from seawater and saline byproducts of oil production, working in partnership with Aramco. The outcomes...

BluSmart Hits $60 Million Annual Run Rate

0
The fleet operator has achieved a 102% annual run rate increase compared to the previous year, growing from USD 30 million in FY23 to...

Important Sectors

Above 1 Cr EVs in India: Which One Would You Pick?

0
An Informed Look At Super Luxury EVs Available In India. As you move up, it starts getting lonelier! The same seems to be true with...

Saudi Arabia Targets Lithium For EV Goals

0
Saudi Arabia has begun investigating techniques to extract lithium from seawater and saline byproducts of oil production, working in partnership with Aramco. The outcomes...

BluSmart Hits $60 Million Annual Run Rate

0
The fleet operator has achieved a 102% annual run rate increase compared to the previous year, growing from USD 30 million in FY23 to...

SOA Collaborates With Kaynes Semicon

0
This collaboration aims to meet the increasing demand for skilled professionals in the field, leveraging the expertise of Perceptive Solutions.  Siksha ‘O’ Anusandhan Deemed to...

StoreDot And Polestar Unveil First 10-Minute EV Charge

0
A 77kWh battery pack featuring StoreDot’s ultra-fast charging high-energy (300Wh/kg) silicon-dominant cells was successfully charged from 10% to 80% in less than 10 minutes...

Manufacturing

Honda Invests $11 Billion In Canadian EV Value Chain

0
As part of its strategy to establish eco-friendly EV and battery facilities in Ontario, Honda's EV value chain will cover every stage of EV...

Honda plans major EV factory construction in Canada,

0
Honda's dedication to this facility reflects its wider ecological objectives, which include a target to only offer zero-emission vehicles by 2040 and to attain...
Sona Comstar

Sona Comstar Launches Mexico Plant For North American EV Demand

0
The new facility, established to address the increasing demand for premium driveline solutions for BEVs in North America, will focus on manufacturing differential assemblies...

Sterling Tools Inks MoU With Yongin For EV Components Facility

0
Sterling Tools announced that this strategic partnership is anticipated to bring in Rs 250 crore in business over the next five years. This collaboration...

Tata Elxsi-Renesas MCU Boosts EV Cost Efficiency And Market Speed

0
The Motor Control Unit's modular, scalable design facilitates integration across various EV applications, reducing time to market by 40%, lowering design and development costs...