BHEL Floats Tender For Battery Energy Storage Systems At Three Areas In Delhi

- Advertisement -
  • The deadline for submission of bids is 18th August 2020
  • The eligibility includes that the applicants must have at least two years of experience executing similar grid-interactive BESS projects

Bharat Heavy Electricals Limited (BHEL) has floated a tender for 410 kWh/415 kW of battery energy storage systems (BESS) at three sites located in Delhi. The scope will include planning, design, engineering, supply, installation, testing, commissioning, and demonstration of all the equipment involved. It is expected that the supplier will provide a one-year warranty for the systems and a comprehensive annual maintenance contract (AMC) for the complete system (including the battery) for five years after the expiry of the warranty period. The deadline for the submission of bids is 18th August 2020. No earnest money deposit will be required to participate in this tender

The tender mentioned the installation of a 230 kWh/125 kW system at Taimoor Nagar, New Friends Colony, a 120 kWh/240 kW system at Dwarka (Ispatika Apartments), and a 60 kWh/50 kW system at TERI School of Advanced Studies, Vasant Kunj Institutional Area. The purchase order will be on a turn-key basis. All the work that includes delivery, installation, and commissioning has to be completed within 21 weeks from the date of signing the purchase order.

Research work within the technical constraints of battery technology

- Advertisement -

The locations have been divided into Category A, B, and C. In the first category. in teh first category, the BESS will be used to manage the overload of a distribution transformer serving mainly residential consumers. In Category B, it will supply back-up power gated group housing society during power outages. In Category C, the BESS at TERI will be charged during off-peak hours and discharged during peak hours. The system will be used for research work within the technical constraints of battery technology.

The eligibility includes that the applicants must have at least two years of experience executing similar grid-interactive BESS projects. They also must have installed and operationalised such systems with a cumulative installed capacity of 125 kW,of which at least one is 30 kW with a capacity of at least two hours. The systems should also follow the standards and guidelines given by the central government.

- Advertisement -

Most Popular Articles

LEAVE A REPLY

Please enter your comment!
Please enter your name here
Captcha verification failed!
CAPTCHA user score failed. Please contact us!

Exclusive

Report Suggests India’s EV Sales Will Surge, Rising 66% In 2024

0
In 2023, sales of electric vehicles (EVs) in India almost doubled due to increased consumer interest, government actions, better infrastructure, and climate change worries....

Ascend Performance Materials: Pioneering Innovation in the Electronics Sector

0
Bridging material advancements in plastics and technological progress, Ascend leads with customised solutions for a safer, reliable and greener tomorrow. Q. How would you explain...

DigiKey Expands Portfolio With 3PEAK

0
This collaboration adds amplifiers, interface components, data converters, and more, catering to industries such as communication, industrial, medical, and automotive.  In a strategic move aimed...

Buzz

CleanMax Alliance With Apple To Boost Renewable Energy In India

0
These installations are anticipated to reduce approximately 207,000 tons of CO2 emissions over their operational lifespan. CleanMax announced a significant joint venture with technology giant...

Ramkrishna Forgings To Supply Powertrain Parts To Top US Electric Carmaker

0
Indian producer of rolled, forged, and machined products enter the US electric vehicle market for the first time. Ramkrishna Forgings, an Indian supplier of rolled,...

Microsoft’s $1.5B AI Venture In UAE Stirs Global Interest

0
New partnership with G42 promises transformative AI advancements in emerging markets, impacting tech and geopolitics. Microsoft has announced a strategic $1.5 billion investment in UAE-based...

Important Sectors

CleanMax Alliance With Apple To Boost Renewable Energy In India

0
These installations are anticipated to reduce approximately 207,000 tons of CO2 emissions over their operational lifespan. CleanMax announced a significant joint venture with technology giant...

Ramkrishna Forgings To Supply Powertrain Parts To Top US Electric Carmaker

0
Indian producer of rolled, forged, and machined products enter the US electric vehicle market for the first time. Ramkrishna Forgings, an Indian supplier of rolled,...

Tesla Power, E-Ashwa To Introduce India’s First EV With Fire Safety Tech

0
The partnership also expands to include the provision of after-sales support for electric vehicle customers by establishing a comprehensive network of sales and service...

Elektrobit Introduces EB zoneo GatewayCore Featuring Infineon’s AURIX TC4x

0
The EB zoneo GatewayCore is designed to connect hardware-dependent accelerators with the Classic AUTOSAR framework, providing adaptable support for intricate routing scenarios. Elektrobit, a premier...

Raptee’s Cell Chemistry Extends Battery Life, Says Dinesh Arjun

0
The Co-founder and CEO of Raptee disclosed that the company is currently sourcing its cells from a variety of countries. Dinesh Arjun, the Co-founder and...

Manufacturing

Ramkrishna Forgings To Supply Powertrain Parts To Top US Electric Carmaker

0
Indian producer of rolled, forged, and machined products enter the US electric vehicle market for the first time. Ramkrishna Forgings, an Indian supplier of rolled,...

AVL And Red Bull To Create High-Density Fuel Cell Technology

0
The advanced technology, featuring ultra-high power density and a lightweight design, is said to be two-thirds lighter than traditional fuel cell systems. This partnership...

JJG Aero Secures $12 Million Investment From CX Partners

0
The Bengaluru-based aerospace components manufacturer intends to use the funds primarily to enhance vertical integration, increase production capacity at the new site, and support...

Tata Electronics Finalizes Semiconductor Agreement With Tesla

0
Ashok Chandak, the head of the India Electronics and Semiconductor Association (IESA), highlighted that Tesla’s initiative to establish a network of domestic suppliers for...

Sterling Tools Targets 40% of Sales from EV Business by FY25

0
This increase is anticipated to come from the EV business segment, which is integral to the company's strategy to diversify its operations. With a certain...